Customer: Vattenfall Europe Windkraft GmbH
Location: Transformer platform, Denmark
Project period: 2020
The original control system was prone to errors and significantly impaired the availability of the crane. The aim was to bring the electrical and hydraulic control system up to the latest state of the art and to optimize operational safety.
Measures implemented:
Benefits achieved:
Result:
This conversion has significantly increased the crane's performance, which optimally meets the requirements for use in the offshore wind industry.
Your partner for offshore solutions:
Greussing Kranservice - specializes in the modernization and optimization of crane control systems for demanding applications.
Greussing Kran- & Anlagentechnik GmbH
Bersbuch 745
A-6866 Andelsbuch